Electricity Supply Management (Swajaldhara): An innovative concept
About Us
Community is considered to be empowered, sensitized
and concerned about their own development if there is a synergy between the
resources available to them. The active participation of community in any
development project certainly proves fruitful beyond the expectation as it confirms
the sustainability of the project. An innovative concept of operation, maintenance
and management of Swajaldhara scheme especially electricity supply management has
been introduced by Abhinav.
Abhinav is implementing the project in 21 GP’s of Muzaffarnagar and 11
schemes are being implemented in district Bijnor. Under the operation, maintenance
and management guidelines of Swajaldhara Operation, maintenance and management cost
of the water supply schemes will have to be fully borne by the concerned community /
user group / Village Water and Sanitation Committee / Panchayati Raj Institution.
This would include recurring costs like salary of operators, electricity charges as
well as cost of periodic repair and renewal. It would be imperative on the part of
the Panchayati Raj Institution / community to have a full understanding and
appreciation of the likely O&M costs of various technology options before they
select the technology for their water supply scheme.
The process of
availing electricity supply included several stages of form filling. After the
consent of treasurer/VWSC a challan of 500 Rs. is made from the bank. After this,
the applications for electricity connections are submitted.
Post submission of forms, the estimates are prepared by JE’s of electricity
department. During inspections different aspects like origin and direction of line
are considered. VWSC supported fully in this regard. 15% supervision charge is
submitted by VWSC to electricity department.
Following inspection, as per standards of electricity department, VWSC purchased
transformers (25 kVA) and other equipments from the authorized supplier. Moreover,
the works related with installation of transformers were completed through certified
contractor of electricity department.
After the installation of transformers is completed, the quality of electricity line
was assessed by electricity safety department and certificate was issued by the
organization for operating these lines. For this, a nominal fee was submitted to the
department. This was done to avoid casualty at the site.
The line was handed over to electricity department with all the formalities and
prescribed information. This was commendable as this task was accomplished within 2
– 3 days and it saved a lot of time. This has certainly set an emulating instance
for all the VWSC’s of the State.
This makes the process an innovative one!
We know what matters most is the convergence of technology with social needs. We
recognize that gap between demand and cycle can only be filled through smart
implementation of technology. For this we bring about innovations supported by
unique technology.
Conservation of water plants :
Water hyacinth (Jalkumbhi) acts as a very good purifier, but there is a fallacy
about it that it spreads all across the water body and traps the oxygen, leaving no
space for aquatic life. For this, we came up with the concept of controlled
plantation of water hyacinth. In this controlled system, we planted water hyacinth
in a net so that it does not get spread all over the pond. Thus, the pond gets its
purifier. Besides this, we also planted other purifying plants like Qyara.
With this, purified water becomes available for fisheries and cattle drinking.
This technology is a tool for sustaining ground water resources of the area as it
increases the time period for which the ground water of certain can be used because
it constantly recharges water.
Low cost water recharging :
We strongly advocate for water conservation. We continuously strive to ensure that
every drop of water is conserved.
For this we have developed a low cost water recharging technology to conserve ground
water through constructing water recharging shafts and pits.
This technology is very much economic and is being appreciated by the community
where it has been implemented. A 500 sqm. recharge pit construction costs Rs.
30,000. This technology is being implemented successfully in big industries, grand
banquet halls, schools and other institutional buildings. There is no provision of
drainage of water in this technology.